Lining 600 Feet of Failing Sewer Pipe at a Major University — Without Digging a Single Trench

When excavation wasn't an option near campus buildings, Pelican Underground used advanced UV-cured GRP lining to restore a university's sewer infrastructure over a single weekend — with zero disruption to campus life.

Project Overview

New Pipes with Failing Seals — 25 Feet Underground, No Room to Dig

Pelican Underground is New Orleans’ trenchless sewer and pipe lining specialist — serving residential homeowners, commercial properties, industrial facilities, and municipalities across Louisiana, Mississippi, and Alabama. We specialize in modern, no-dig solutions that repair or replace damaged underground pipes without excavating your yard, driveway, or infrastructure. From CIPP pipe lining and vertical stack lining to hydro jetting and sewer camera inspection, our licensed team brings decades of expertise to every project in New Orleans and across the Gulf Coast.

Our expert team delivers reliable sewer and drain services that protect your property while solving complex issues beneath the surface. With decades of experience and cutting-edge technology, we’re ready to tackle any sewer or drain challenge across Louisiana and neighboring states.

600 ft

Pipe Lined

25 ft

Below Surface

1

Weekend to Complete

50 yr

Design Lifetime

Project Details

Property Type:

Major Research University, St. Louis, MO

Pipe Scope:

300 ft of 24-inch pipe + 300 ft of 12-inch pipe

Problem:

New pipes with failing seals

Solution:

Saertex UV GRP Pipe Lining (CIPP)

Equipment:

ProKASRO Professional Curing Unit

Certification:

Certified Saertex Installer

Time to Complete:

1 Weekend

Design Life:

50-Year Minimum

The Challenge

Three Obstacles That Ruled Out Conventional Repair

This wasn’t a typical repair job. The combination of depth, proximity to structures, and space constraints created a scenario where traditional excavation was not viable — and the stakes were high.

Depth: 25 Feet Down

The failing sewer lines ran 25 feet below the surface. Excavating to that depth is a major civil engineering undertaking — requiring shoring, confined space protocols, and significant heavy equipment.

Proximity to Buildings

The pipe routes ran close to existing campus structures. Digging at that depth, in those locations, carried a real risk of undermining building foundations — a risk no university would accept.

No Room to Work

The size of the excavation pit required to safely access the lines would have exceeded the allowable working area on campus. There was simply not enough space to dig, even if the other obstacles didn’t exist.

Our Solution

Advanced UV GRP Pipe Lining — No Excavation Required

Pelican Underground deployed CIPP (Cured-in-Place Pipe) lining using premium Saertex UV GRP materials — the same technology trusted in demanding municipal and industrial applications worldwide. Here’s how the project was executed:

Step 1: Pre-Lining Camera Inspection & Pipe Assessment

Before any liner was inserted, our team conducted a thorough sewer camera inspection of all 600 feet of pipe. This confirmed the location and nature of the failing seals, verified pipe geometry, and established the baseline condition — ensuring the correct liner specs were selected for both the 24-inch and 12-inch sections.

Step 2: Saertex UV GRP Liner Preparation & Staging

Using Pelican Underground’s certified expertise as a Saertex installer, the UV glass-reinforced polymer liners were precisely measured, cut, and staged for installation. The ProKASRO Professional Curing Unit — operating from our on-site box truck — was set up and calibrated to deliver consistent UV energy across the full liner length for both pipe diameters.

Step 3: Liner Installation — 300 Ft of 24-Inch Pipe

The Saertex UV GRP liner was inserted into the 24-inch main sewer line through existing access points — no new excavation needed. Once positioned, the ProKASRO unit pulled the UV light train through the liner, curing it in place from the inside out. The result: a structurally independent, jointless new pipe formed within the existing host pipe.

Step 4: Liner Installation — 300 Ft of 12-Inch Pipe

The same certified process was applied to the 12-inch line. Saertex UV GRP materials are engineered to conform precisely to the internal geometry of the host pipe, sealing all joints and defects without any ground disturbance. Both diameter liners were completed within the same weekend mobilization.

Step 5: Post-Cure Inspection & Verification

Following curing, a final camera inspection was performed to confirm complete liner adhesion, joint sealing, and structural integrity across all 600 feet. The university received documentation confirming the lines met their 50-year design life specification.

Dig vs. No-Dig

Why Trenchless Was the Only Real Answer

Factor
Traditional Excavation
Pelican Underground (UV GRP Lining)
Feasibility Near BuildingsNot viable — foundation riskFully viable — no excavation
Space RequirementsLarge pit required — exceeded allowable areaAccess through existing openings only
Time to CompleteWeeks to monthsOne weekend
Campus DisruptionHeavy equipment, closed paths, noiseZero disruption to campus activity
Landscaping ImpactLawns, sidewalks, hardscaping destroyedAll landscaping preserved
Design Life of RepairVaries by new pipe material50-year minimum (Saertex certified)
Risk to StructuresHigh — potential foundation underminingNone

Project Results

600 Feet Restored. One Weekend. Zero Trenches.

The project was completed on schedule, within the allotted weekend window, with no disruption to the university’s campus operations, landscaping, or surrounding structures.

Time Saved:

What would have taken weeks or months of traditional excavation and construction was completed in a single weekend mobilization.

Campus Impact:
The pipe routes ran close to existing campus structures. Digging at that depth, in those locations, carried a real risk of undermining building foundations — a risk no university would accept.
Structural Safety:

By eliminating all excavation, the risk of undermining nearby building foundations was completely avoided.

Long-Term Performance:

All Saertex UV GRP liners are designed to meet a 50-year minimum service life — with significantly longer performance expected.

Why Pelican Underground

The Right Expertise for Complex, High-Stakes Pipe Rehabilitation

University and institutional infrastructure projects come with layers of complexity that demand a contractor with both technical certification and real-world experience. Pelican Underground brought the following to this project:

Have a Complex Pipe Problem? Let's Talk.

Whether you’re managing university infrastructure, a commercial facility, or a municipal system, Pelican Underground has the equipment, certifications, and experience to solve it — without digging up your property.

Contact Pelican Underground today to discuss your project. (504) 387-9909 | Open Daily 7am–9pm

Pelican Underground Llc promotes Vertical Stack Lining for efficient, modern building through simple, clear messaging.

Nullam quis risus eget urna mollis ornare vel eu leo. Aenean lacinia bibendum